PRIMARY PUBLIC SCHOOL

JASTRZEBIE ZDROJ, POLAND

A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.

4 STOPS

800 KG

HYDRO ELEVATOR

Photo Gallery

More projects

makedonia palace

MAKEDONIA PALACE

MAKEDONIA PALACE THESSALONIKI GREECE Makedonia Palace is a five star hotel in Thessaloniki. In 44 days time, 4 elevators of 10 stops each (visitors) were

DSCF

HISTORICAL OFFICES BUILDING

HISTORICAL OFFICES BUILDING THESSALONIKI, GREECE The Longos mansion, also known as the Red House, is a three-storeyhouse in Agias Sofias Square in the center of

knez mihajlova

H&M STORES

H&M STORES SERBIA H&M is the world’s second largest clothing retailer with some 4000 shopsaround the globe. In total, elevators were installed in 4 cities

cbeefcdfadae

TOWER

TOWER LIMASSOL, CYPRUS In this stunning state-of-the-art high-rise building, 2 long-distance elevators(15 stops) had to be installed. The building is known for its luxury apartmentsand

royal hotel

HOTEL

HOTEL THESSALONIKI GREECE In one of the best hotels in Northern Greece, Wyltor installed 1 panoramicelevator with a maximum weight of 1125kg, 1 hydraulic elevator

hd cityhall

CITY HALL

CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,