ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
sp big

PRIMARY PUBLIC SCHOOL

JASTRZEBIE ZDROJ, POLAND

A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.

4 STOPS

800 KG

HYDRO ELEVATOR

Photo Gallery

More projects

Hotel Oran Algeria

HOTEL ORAN

HOTEL ORAN ORAN, ALGERIA In a newly established hotel in Oran, Algeria, a 11-stop MRL elevator was installed for the best travel experience and comfort

DSCF

RESIDENTIAL BUILDING

LUXURY RESIDENTIAL COMPLEX THESSALONIKI, GREECE 6-stop MRL elevator with a maximum load up to 630 kg, were installed in thefacilities of a luxury residential complex.

pb040255

ALIMOS PEDESTRIAN BRIDGE

ALIMOS PEDESTRIAN BRIDGE ATHENS, GREECE The construction of the pedestrian bridge in Alimos, was completed on October 23th, 2020. As one of the few pedestrian

hd cityhall

CITY HALL

CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

DSCF

HISTORICAL OFFICES BUILDING

HISTORICAL OFFICES BUILDING THESSALONIKI, GREECE The Longos mansion, also known as the Red House, is a three-storeyhouse in Agias Sofias Square in the center of

makedonia palace

MAKEDONIA PALACE

MAKEDONIA PALACE THESSALONIKI GREECE Makedonia Palace is a five star hotel in Thessaloniki. In44 days time, 4 elevators of 10 stops each (visitors) weredismantled and