ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
sp big

PRIMARY PUBLIC SCHOOL

JASTRZEBIE ZDROJ, POLAND

A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.

4 STOPS

800 KG

HYDRO ELEVATOR

Photo Gallery

More projects

Hotel Oran Algeria

HOTEL ORAN

HOTEL ORAN ORAN, ALGERIA In a newly established hotel in Oran, Algeria, a 11-stop MRL elevator was installed for the best travel experience and comfort

win stadium ocean

STADIUM

STADIUM SYDNEY, AUSTRALIA Positioned overlooking the Pacific Ocean, in Wollongong (Sydney), and venuecapacity 22.000, this stadium is designed as a multi-purpose facility with theability to

makedonia palace

MAKEDONIA PALACE

MAKEDONIA PALACE THESSALONIKI GREECE Makedonia Palace is a five star hotel in Thessaloniki. In 44 days time, 4 elevators of 10 stops each (visitors) were

IMG abfbbbaffed V

COMPLEX LAZARET

COMPLEX LAZARET HERCEG NOVI, MONTENEGRO Complex Lazaret is an adaptive reuse of an old 18th Century Venitian Lazaret.This architectural complex consists of two parts: a

hd cityhall

CITY HALL

CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

residential valetta malta

RESIDENTIAL BUILDING

RESIDENTIAL BUILDING VALETTA, MALTA For the needs of the residential complex, a 4-stop MRL elevator was installedin Valletta, Malta. 1 ELEVATOR 4 STOPS MRL ELEVATOR