
PRIMARY PUBLIC SCHOOL
JASTRZEBIE ZDROJ, POLAND
A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.
4 STOPS
800 KG
HYDRO ELEVATOR
Photo Gallery
More projects

HOTEL ORAN
HOTEL ORAN ORAN, ALGERIA In a newly established hotel in Oran, Algeria, a 11-stop MRL elevator was installed for the best travel experience and comfort

STADIUM
STADIUM SYDNEY, AUSTRALIA Positioned overlooking the Pacific Ocean, in Wollongong (Sydney), and venuecapacity 22.000, this stadium is designed as a multi-purpose facility with theability to

MAKEDONIA PALACE
MAKEDONIA PALACE THESSALONIKI GREECE Makedonia Palace is a five star hotel in Thessaloniki. In 44 days time, 4 elevators of 10 stops each (visitors) were

COMPLEX LAZARET
COMPLEX LAZARET HERCEG NOVI, MONTENEGRO Complex Lazaret is an adaptive reuse of an old 18th Century Venitian Lazaret.This architectural complex consists of two parts: a

CITY HALL
CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

RESIDENTIAL BUILDING
RESIDENTIAL BUILDING VALETTA, MALTA For the needs of the residential complex, a 4-stop MRL elevator was installedin Valletta, Malta. 1 ELEVATOR 4 STOPS MRL ELEVATOR