ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
pb040255

ALIMOS PEDESTRIAN BRIDGE

ATHENS, GREECE

The construction of the pedestrian bridge in Alimos, was completed on October 23th, 2020. As one of the few pedestrian bridges in Athens, it’s
an important addition for the safety of the pedestrians and it’s of special architecture interest. 4 panoramic elevators with glass doors were installed, in order to provide the best service to the pedestrians, while maintaining the architectural value of the project.

4 PANORAMIC ELEVATORS

630 KG

GLASS DOORS

MRL ELEVATORS

Photo Gallery

More projects

hd cityhall

CITY HALL

CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

Hotel Oran Algeria

HOTEL ORAN

HOTEL ORAN ORAN, ALGERIA In a newly established hotel in Oran, Algeria, a 11-stop MRL elevator was installed for the best travel experience and comfort

sp big

PRIMARY PUBLIC SCHOOL

PRIMARY PUBLIC SCHOOL JASTRZEBIE ZDROJ, POLAND A 4-stop Hydro elevator with a capacity of 800kg was installed in the PrimaryPublic School of Jastrzebie Zdroj, in

DSCF

RESIDENTIAL BUILDING

LUXURY RESIDENTIAL COMPLEX THESSALONIKI, GREECE 6-stop MRL elevator with a maximum load up to 630 kg, were installed in thefacilities of a luxury residential complex.

win stadium ocean

STADIUM

STADIUM SYDNEY, AUSTRALIA Positioned overlooking the Pacific Ocean, in Wollongong (Sydney), and venuecapacity 22.000, this stadium is designed as a multi-purpose facility with theability to

residential valetta malta

RESIDENTIAL BUILDING

RESIDENTIAL BUILDING VALETTA, MALTA For the needs of the residential complex, a 4-stop MRL elevator was installedin Valletta, Malta. 1 ELEVATOR 4 STOPS MRL ELEVATOR