
PRIMARY PUBLIC SCHOOL
JASTRZEBIE ZDROJ, POLAND
A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.
4 STOPS
800 KG
HYDRO ELEVATOR
Photo Gallery
More projects

HISTORICAL OFFICES BUILDING
HISTORICAL OFFICES BUILDING THESSALONIKI, GREECE The Longos mansion, also known as the Red House, is a three-storeyhouse in Agias Sofias Square in the center of

MAKEDONIA PALACE
MAKEDONIA PALACE THESSALONIKI GREECE Makedonia Palace is a five star hotel in Thessaloniki. In 44 days time, 4 elevators of 10 stops each (visitors) were

OFFICE & SHOWROOM BUILDING
OFFICE & SHOWROOM BUILDING ATHENS, GREECE A refurbishment took place in an Office building & Showroom in Athens,Greece. All of the panels and all the

COMPLEX LAZARET
COMPLEX LAZARET HERCEG NOVI, MONTENEGRO Complex Lazaret is an adaptive reuse of an old 18th Century Venitian Lazaret.This architectural complex consists of two parts: a

CITY HALL
CITY HALL POLYGYROS, GREECE The installation of an elevator in this project was a special case, as there wasno space predicted in the historic building,

PRIVATE HOME
PRIVATE HOME LIMASSOL, CYPRUS A 3-stop Hydro elevator was installed in a luxury residency in Limassol,Cyprus. The cabin is defined by the prestigeous look and



