PRIMARY PUBLIC SCHOOL
JASTRZEBIE ZDROJ, POLAND
A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.
4 STOPS
800 KG
HYDRO ELEVATOR
Photo Gallery
More projects

RESIDENTIAL BUILDING
RESIDENTIAL BUILDING VALETTA, MALTA For the needs of the residential complex, a 4-stop MRL elevator was installedin Valletta, Malta. 1 ELEVATOR 4 STOPS MRL ELEVATOR

HISTORICAL OFFICES BUILDING
HISTORICAL OFFICES BUILDING THESSALONIKI, GREECE The Longos mansion, also known as the Red House, is a three-storeyhouse in Agias Sofias Square in the center of

H&M STORES
H&M STORES SERBIA H&M is the world’s second largest clothing retailer with some 4000 shopsaround the globe. In total, elevators were installed in 4 cities

ALIMOS PEDESTRIAN BRIDGE
ALIMOS PEDESTRIAN BRIDGE ATHENS, GREECE The construction of the pedestrian bridge in Alimos, was completed on October 23th, 2020. As one of the few pedestrian

TOWER
TOWER LIMASSOL, CYPRUS In this stunning state-of-the-art high-rise building, 2 long-distance elevators(15 stops) had to be installed. The building is known for its luxury apartmentsand

RESIDENTIAL BUILDING
LUXURY RESIDENTIAL COMPLEX THESSALONIKI, GREECE 6-stop MRL elevator with a maximum load up to 630 kg, were installed in thefacilities of a luxury residential complex.



