ΕΣΠΑ ΕΠΑνΕΚ 2014 2020
sp big

PRIMARY PUBLIC SCHOOL

JASTRZEBIE ZDROJ, POLAND

A 4-stop Hydro elevator with a capacity of 800kg was installed in the Primary
Public School of Jastrzebie Zdroj, in Poland. The elevator was installed in
order to help students with mobility problems.

4 STOPS

800 KG

HYDRO ELEVATOR

Photo Gallery

More projects

DSCF

RESIDENTIAL BUILDING

LUXURY RESIDENTIAL COMPLEX THESSALONIKI, GREECE 6-stop MRL elevator with a maximum load up to 630 kg, were installed in thefacilities of a luxury residential complex.

residential valetta malta

RESIDENTIAL BUILDING

RESIDENTIAL BUILDING VALETTA, MALTA For the needs of the residential complex, a 4-stop MRL elevator was installedin Valletta, Malta. 1 ELEVATOR 4 STOPS MRL ELEVATOR

DSCF

HISTORICAL OFFICES BUILDING

HISTORICAL OFFICES BUILDING THESSALONIKI, GREECE The Longos mansion, also known as the Red House, is a three-storeyhouse in Agias Sofias Square in the center of

win stadium ocean

STADIUM

STADIUM SYDNEY, AUSTRALIA Positioned overlooking the Pacific Ocean, in Wollongong (Sydney), and venuecapacity 22.000, this stadium is designed as a multi-purpose facility with theability to

received

LUXURY PRIVATE HOME

LUXURY PRIVATE HOME LONDON, UNITED KINGDOM In the heart of London, a 6-stop MRL elevator with a maximum load capacityof 630kg was installed in a

IMG

PRIVATE HOME

PRIVATE HOME LIMASSOL, CYPRUS A 3-stop Hydro elevator was installed in a luxury residency in Limassol,Cyprus. The cabin is defined by the prestigeous look and